Do data centers create jobs? How to check what a project will bring to a region

Yes, but the figure depends on what is counted. Construction and operations are different, a total can include jobs outside the data center, and a promise should be read with the document behind it.

Computer rendering of a waterfront city with parks, towers and an observation wheel

Construction jobs and permanent jobs

Building a data center and operating it need different numbers of people. Ask for the two figures separately, with the unit of each. A published example comes from the Joint Legislative Audit and Review Commission (JLARC), which reports to Virginia's legislature.

At the height of construction

"Construction of an individual data center building usually takes about 12 to 18 months, and data center representatives indicated that, at the height of construction, approximately 1,500 workers are on site from various construction-related industries."

BasisJLARC, Data Centers in Virginia, December 2024. People on site at the peak, one building, as told by industry representatives. The sentence does not give the size of the building.

In operation

"Several data center representatives indicated that a typical 250,000-square-foot data center may have approximately 50 full-time workers, about half of which are contract workers."

BasisJLARC, same report. One facility of a stated floor area, no MW given, again as told by industry representatives.

A peak headcount and a full-time staff are different measures, and the two sentences may not describe the same size of building. Do not turn them into a ratio.

One evaluation, several job numbers

In December 2025 the University of Georgia's Carl Vinson Institute of Government evaluated the state's sales and use tax exemption for data centers, for the Georgia Department of Audits and Accounts. Its job figures for 2025 are modelled estimates.

Jobs in Georgia, 2025 estimateOperationsConstruction
Direct1,87315,809
Total, with indirect and induced jobs5,47128,350
Part the researchers attribute to the exemption (30%)1,6418,505

Indirect and induced jobs arise elsewhere in the economy, for example as contractors buy supplies and workers spend their wages. The last row answers another question: what would not have happened without the tax exemption. The researchers estimate that 70% of data center construction activity would have occurred anyway. According to the state auditor's summary, they apply the remaining 30% "to all data center economic activity". The evaluation notes that a 2022 study had assumed that 90% of data center activity was due to the exemption. Sources: full evaluation and the state auditor's summary, December 2025, revised January 2026.

So one document gives several answers to "how many jobs", each to its own question. Quote a figure together with its row and column.

Three questions for any job number

1What is counted?

Direct jobs only, or indirect and induced jobs too. People at the peak, or full-time positions. Employees only, or contractors as well. One building, a county or a state. Which year.

2Whose number is it?

A company's statement, a model, a survey or a report checked against records. Ask for the study, who paid for it and what it assumes.

3What would happen anyway?

A figure for all activity and a figure for the activity a project or an incentive adds are not the same. Ask which one you are reading and what share is assumed.

Tax and economic value are different results

The Georgia evaluation shows why a large economic figure should not be read as tax revenue. For 2025 it estimates $474.2 million of state tax forgone through the exemption. Against that it sets $34.6 million of additional state tax from construction and equipment and $6.9 million from operations. Its net result is $432.6 million less state tax revenue (Table A). The two sides are counted on different bases. As the state auditor's summary puts it, "revenue is forgone for all projects", but only 30% "could be attributed to the tax exemption". The evaluation cuts the additional collections to that share.

The same work also measures value added. The evaluation equates it to an increase in state GDP. It is not the same as state tax revenue. For FY 2025, the auditor's summary attributes to the exemption $1.0 billion of value added from construction and $247.0 million from operations. The summary compares the two and concludes: "State economic growth was significantly higher than the forgone state revenue." (summary)

These are estimates for one state and one incentive. They are not a verdict on incentives elsewhere.

Local revenue can matter a great deal, and it differs from place to place. For five Virginia localities with relatively mature data center markets, JLARC reports that "data center revenue ranged from less than 1 percent to 31 percent of total local revenue" (report). Ask for local revenue after abatements, and keep it separate from state figures.

Water and power, next to the benefits

Put resource use on the same page as jobs and revenue, for the same place. On water, JLARC found that in its Virginia data "most data centers use about the same amount of water (or less) as an average large office building (6.7 million gallons per year), although a few require substantially more, and some require less than a typical household". The same report adds that "In 2023, 11 data center buildings each used over 50 million gallons, including one building that used 243 million gallons (10 percent of the industry's total use)". JLARC notes that these figures are per building, not per campus, and that data was available for the large majority of data centers in Virginia, but not all. At the six water utilities it reviewed, "industry use made up from 0.2 to 21 percent of water use, after excluding reclaimed water use" (report).

An average does not tell you what one site will take from one supplier. Ask for the project's expected water volume, source and cooling design. For power, ask what the utility has confirmed, which grid works are needed and who pays for them. See the stages of grid interconnection.

Skills: from training to a shift on site

Hiring is hard for many operators. In its 2026 survey, Uptime Institute reports that "more than half (53%) of operators report difficulties finding qualified candidates for vacant roles", against 46% in 2025, and names electrical and junior-level operations roles, 38% each, among the largest skills gaps (survey, July 2026). It is a worldwide survey of operators by Uptime Institute, not a measure of any region or training program.

A training promise needs more than a number of places. Ask for more than a course certificate as evidence that someone can work on a live facility:

  • How many people are expected to enrol, and how many to finish.
  • Which roles the program prepares for, and what graduates are authorized to do on site.
  • Where they practise on operating equipment, and who supervises them.
  • Who has agreed to hire them, how many, and on what terms.
  • How long it takes before a new hire can cover a shift without supervision.

Research and local demand

Research partners and local users can be part of what a data center brings. They carry very different weight depending on what stands behind them.

Interest

Meetings, letters of support and lists of possible users. They show where to look, not what will be bought. A university's interest in a project is not a purchasing commitment.

Pilot

A defined test with a user, success criteria and a budget. A successful pilot supports a discussion about production. It does not by itself reserve capacity.

Signed contract

A named buyer, what is bought, volume, price, term and conditions. It supports only what has actually been committed.

Compute that the campus uses for itself is not demand from an independent customer. Until there is a contract, treat local demand as a possibility, and test whether the project holds without it. For client contracts, see what an offtake agreement should settle.

Who pays, and what binds anyone

For each promise about training, research or community programs, ask who pays, how much, for how long and who delivers. Money already needed to run the facility or repay lenders should not be counted a second time as a regional budget.

Then read the wording of the agreement. These are different things:

  • An expectation mentioned in the background section.
  • A promise to make good-faith or reasonable efforts.
  • A plan or target to be written later.
  • An obligation with a figure, a date, a way to check it and a consequence if it is missed.

Check too whether the obligations start only after something else happens, such as permits or financing. Have your own counsel confirm what binds whom.

One page to ask for

Before a region relies on a benefit, put each promise on one line and fill in the columns.

The number

What is counted, its unit, the place and the year.

Its source

Statement, model, survey or checked report, with who paid for it.

The comparison

The starting level before the project, and what would happen without it.

The other side

Tax forgone or abated, water, power and grid works, for the same place.

The commitment

The document, its wording, the conditions, who checks and when.

Mark each line confirmed by a document, supported by a third party or still a claim. After the project opens, report measured results apart from targets.

How we help

Our work is on the project itself. In a site and power assessment we check grid connection, power price and dates against documents. For an investor or lender, we check the developer's capex, schedule, power, hardware and financial model against our reference model. Economic impact studies, tax questions and the wording of agreements need your own economists and counsel.

Questions we hear

Do data centers create jobs after construction?

Yes. Operating a data center needs staff. In the Georgia evaluation, the researchers projected 1,873 direct jobs in operating data centers statewide for 2025. That is a model estimate for one state, not a figure for a facility.

How many permanent jobs does a data center create?

There is no single figure. Virginia's JLARC reports that several industry representatives indicated a typical 250,000-square-foot data center may have approximately 50 full-time workers, about half of them contract workers. Size, type and what is counted change the number.

Is a large economic impact the same as tax revenue?

No. In the Georgia evaluation, the net effect of the exemption on state tax revenue is negative, while the auditor's summary, comparing economic growth with the forgone revenue, concludes that the growth was significantly higher. The two results measure different things.

Is this tax, legal or investment advice?

No. It is a way to organize the evidence behind a claim. Tax, legal and investment questions need your own specialists and counsel.